Rate Analysis For Road Construction | PDF | Asphalt ...

Rate Analysis for construction of Black top road. Sn. Items 1 Sub grades Preparation of Sub-grade for rehabilitation filling or cutting depth of (10-20cm) Common soil per 1 Sq.m. Description unskilled miscellane. Sub-Total Contractor overhead 15% Sub-Total Vat 13% Grand total with Vat per.

Steps in Bituminous Road Construction - The Constructor

The Arunachal Pradesh Schedule of Rates and Analysis of Rates covering the items of building works and services was last published in the year 2014. The Schedule of Rates provides a basic frame work to evaluate cost estimate of the projects. Over the period of last few years, the prices of …

Cost Estimating Guide for Road Construction

Published September 8, 2020 Cost Estimating Guide for Road Construction USDA FOREST SERVICE NORTHERN REGION ENGINEERING

SCHEDULE OF RATES - arunachalpwd.org

The Arunachal Pradesh Schedule of Rates and Analysis of Rates covering the items of Road and Bridge works was last published in the year 2014. The Schedule of Rates and Analysis of Rates provide a basic frame work to evaluate cost estimate of the projects. Over the period of last few years, the prices of labour and materials ... P&M-004 Bitumen ...

How is road work calculated? - Wikipedikia Encyclopedia

The earthwork cost is calculated by estimating the number of cubic meters of common material and rock which must be moved to construct the road. The earthwork production rate is calculated as the kubieke meter per uur which can be excavated and placed divided by the number of cubic meters per km to be excavated.

Asphalt and bitumen testing :: Anton-Paar.com

Analysis of asphalt and bitumen and their additives at the refinery ensures that they meet the specifications. Anton Paar's measuring instruments and dedicated asphalt testing solutions deliver valuable insights into material properties which affect …

GOVERNMENT OF KERALA

between 8 a.m. to 5 p.m.) hire at the rate of 1.20times the hourly rate applicable for that day( based on the rate of 8 hours), shall be levied for every extra hour or part thereof. (d) The average out- turn expected from a power roller for a day of 8 hours is as fixed by the Chief Engineer (R& B) for various items of road work.

Rate Analysis of Bitumen works done in Road and Highways ...

Rate Analysis of Bitumen works done in Road and Highways Rate analysis of all bitumen works done in Roads and Highways are attached in this …

Bitumen Calculator (Tack Coat) - Civil Engineering Calculators

Bitumen Calculation. Area for Bitumen=Length ×Breadth Area for Bitumen= Length × Breadth. Total Quantity=Total Area×Rate of Spray Total Quantity= Total Area × Rate of Spray. Where, m 2 is a Square meter. length, breadth in mater/cm. Note: 1 m 2 = 10.7639 ft 2.

(PDF) PUBLIC WORKS ANALYSIS OF RATES FOR ROAD WORKS ...

I Road Work contd. 3 Hauling (123 100 kg) MachinesITrucks Tippers 5 Nos Day 1 Fuel (Diesel Oil) Tipper (5 Nos. x 4 trips x 15 Lit) litre 300 Labour Charges Tipper Driver Man-Day 5 4 Compacting AC Mix (123 100 kg) ~achinesl~kck Paver (Blow-knox) Day 1 Steel Roller () Day 1 Steel Roller (Sakai) Day 1 Tyred Roller () Day 1 Tyred Roller ...

Asian Development Bank

Unit Quantity Rate MoRTH Amount MoRTH 4.01 Providing and applying primer coat with bitumen emulsion on prepared surface of granular Base including clearing of road surface and spraying primer at the rate of 0.60 kg/sqm using mechanical means. 502 sqm 24,023.81 28.00 672,666.61

Why is Bitumen Used in Road Construction? Properties and ...

Use of Bitumen in Flexible Road Construction. The reason behind the significant application of bitumen in flexible pavements are explained below: 1. Production of Bitumen is economical. Bitumen is a by-product of crude oil distillation process. Crude oil itself is a composition of hydrocarbons.

Bitumen emulsions in road construction - A review

The executed quantities in the BOQ were the total quantities of work items for site clearance, earthworks, in-situ concrete, reinforcement, formwork, gravel sub-base/base, bitumen, road line ...

road construction estimating EXCEL spreadsheet ...

Files > Download road construction estimating EXCEL spreadsheet - CivilEngineeringBible.com (FREE!) Terrain and soil conditions, road standards, machine and labor costs etc. are considered as the prime factors which can change the road construction cost significantly. Besides, the skills of the associated operators and labors are also affected.

Construction cost in India. Order Detailed construction ...

A detailed cost estimate is a step by step calculation of the material and labor required to complete a construction project. This document is prepared after analyzing the architectural, structural, elevation and other drawings of the building and has all details about the cost, material and labor involved in a project.

ANALYSIS OF RATES FOR DELHI

1.0 C.P.W.D. Analysis of Rates for Delhi, 2007 is the revised edition of C.P.W.D. Analysis of Rates for Delhi, 1997. 2.0. DAR, 2007 incorporates most of the analysis of DAR, 1997 with all correction slips up-to date and will replace DAR, 1997. 3.0 DAR, 2007 is a bilingual document (Hindi version will follow).

BILL OF QUANTITIES

preparation of surface with road broom, application of prime coat @ 0.75 kg/sq.m by mechanized method using asphalt plant, paver, vibratory roller, steel roller, etc. complete – 75mm thick Sqm 78,000.00 4.6 A/R Providing and Laying Asphalt/Bituminous Concrete to required degree of …

BILL OF QUANTITIES FOR ROAD WORKS

road with bitumen heated in bitumen boiler fitted with the spray set spraying using 98 kg of bitumen of grade VG - 10 and blinding surface with 0.90 cum of stone aggregate of 6.7 mm size (Passing 11.2 mm sieve and retained on 2.36 mm sieve) per 100 sqm of road surface, including rolling and finishing with power road roller all complete. 4,500 ...

Bitumen Market Size and Share | Industry Statistics - 2027

Bitumen Market size was valued at around USD 49.74 billion in 2020 and will exhibit a growth rate of over 4.4% CAGR from 2021 to 2027. Rapid industrialization in emerging countries is likely to escalate the demand for bitumen in various applications such as roadways, waterproofing, adhesives, and insulation. Bitumen, also known as asphalt, is a ...

Technical specification road work Bitumen macadam and ...

Bitumen macadam and bitumen concrete

How to calculate Quantity of Bitumen and Aggregates for ...

In this video i am going to show you how bitumen and aggregates are to be calculated for road surface dressing (Top Layer of the road).....For calculating t...

Analysis & Rates, Analysis and rates for construction work ...

Analysis & Rates. The capacity of doing work by an artisan or skilled labour in the form of quantity of work per day is known as the task work or out turn of the labour. ... Bitumen or asphalt for painting on D P C or on roof – 1 st coat. 15 kg for 100sqft. 150 kg for 100 sqm .

Specification for Bituminous Macadam

The grade of bitumen to be used would depend upon the climatic conditions and the traffic. Guidelines for selection of viscosity grade of paving grade bitumen are given in Tables 1.1 and 1.2. [Comments: BM is an un-designed, recipe type mix used for low traffic roads. It is not technically justified to use any modified bitumen in BM.

Why Do We Use Paver Blocks In Road Construction? [Civil ...

Advantages & Applications of Paver blocks in road construction. The paver blocks are installed at the levelled earth surface by an interlocking system, as shown in the below picture. The minimum cost is enough to maintain the paver block road. It is mostly used in …

NORMS FOR RATE ANALYSIS OF ROAD AND BRIDGE WORKS

In absence of approved rate for night time work, rate may be used as 1.4 times higher than day times work. GENERAL GUIDELINES FOR USE OF THIS NORMS FOR RATE ANALYSIS OF ROAD AND BRIDGE WORKS. NORMS FOR RATE ANALYSIS S No …

Cost Estimating Manual for projects

but undefined requirements for an activity or work item. Allowance is a base cost item. Base Cost Estimate – The term "base cost estimate" was developed by WSDOT for cost risk analysis and represents the reviewed and/or validated project cost estimate to …

Method Statement for Flexible Pavement Asphalt Driveway ...

The purpose of this method statement is to describe steps for flexible pavement that can also include asphalt driveway rehabilitation and road resurfacing. The sequence of the work to be carried out shall be as follows: Resurfacing Works Partial Reconstruction Works Total Reconstruction Works Cold In-Place Recycle (CIPR) – Cement Treated Base Cold In-Place Recycling…

Analysis Of Rate For Road Work Morth

Calculate Quantity for Asphalt in Road. Rate Analysis Of Civil Work | How to Prepare Rate Analysis | Rate Analysis for 1000 sqft Page 3/13. Access Free Analysis Of Rate For Road Work Morth house plan The Road - Explained through Illustration The Road - What it all Meant Rates Analysis For Calculating Material and

BITUMINOUS ROAD PPT - SlideShare

4. Bitumen is often confused with tar. Although bitumen and coal tar are similarly black and sticky, they are distinctly different substances in origin, chemical composition and in their properties. ORIGIN- Asphalt material have been utilized since 3500 B.C .In building and road construction.

ANALYSIS OF RATES - worksodisha.gov.in

Rate Rs. P Amount Rs. P Remarks 12 34567 Quantity required ( b) Earth work in hard soil or gravelly soil in embankment, roads etc. within 50m initial lead and 1.5m initial lift including rough dressing and breaking clods to maximum 5cm to 7cm and laying in layers not …

RATE ANALYSIS OF CONSTRUCTION ITEMS

New rates of these items can be worked out easily by changing the rates of materials and labours based on current market rates. It is useful for Consultants, Contractors, Architects and Builders for preparing the Rate Analysis of items like Concrete, Brickwork, Plaster etc. Rate analysis of various type of projects like, Buildings, Roads, Bridges,

Rate Analysis of RCC (Reinforcement Cement Concrete)

As per calculation of rate analysis in labor consumption per Cu.m. requirement as per our experience or CPWD book, this book public by Central Public Works Department, Government of India for easy calculation of the rate analysis, etc.. As CPWD Mate per cu.m. 0.27 of day bhisti, per cu.m.0.6-day coolie, per cu.m. 0.05-day Mason -2nd, per cu.m. 0.05-day mason 1st, per cu.m. 0.04-day mate

250+ TOP MCQs on Analysis of Rate of Road Work and Answers

250+ TOP MCQs on Analysis of Rate of Road Work and Answers. Civil Engineering Drawing Multiple Choice Questions on "Analysis of Rate of Road Work". 1. In countries where traffic flows on the right, traffic signs are mostly on the left side of the road. a) True.